Temp power B-2 missing GFCI (wet side)
Building B · temp power · panel B-2
Panel B-2 wet-side circuits lack GFCI. Stop energize until kits installed and photo-documented. Life-safety hold — superintendent owns clear.
S. Patel (MEP lead)
Sample multi-family board — Building B · United States (demo project)
Filing as · Jobsite crew
Role stamps author on reports, photo notes, and BD messages. Not a city login.
Sample board
Explore freely, then set up your jobsite when ready — Setup → New blank. Opening the app always lands on this board, not a blank project.
Building B · temp power · panel B-2
Panel B-2 wet-side circuits lack GFCI. Stop energize until kits installed and photo-documented. Life-safety hold — superintendent owns clear.
S. Patel (MEP lead)
Stair tower 2
Landings missing mid-rail sections. Barricade up; crews staged off tower until corrected. Photo note recommended for insurance pack.
J. Okonkwo (safety)
Building B · grid 5–6
Inspector found chair height deficiency at two locations. Corrected chairs; re-request when bay open. Attach photos to this report from Board.
L. Nguyen (civil) · wired to authority lane · seen by M. Reyes
South elevation
Mock-up set south elevation. Continuous run blocked until lot certificates on file with office.
A. Chen (GC PM)
No photo notes yet. Use Photo note or attach images when filing a report.
Footing / rebar — Building B
2026-08-03 · 07:30–10:00 · Grid lines 3–6
Framing rough — level 2
2026-08-07 · Afternoon · Building B level 2