Jobsite · fieldBP-2026-44108 (demo) · TX

Priority board

Sample multi-family board — Building B · United States (demo project)

Filing as · Jobsite crew

Role stamps author on reports, photo notes, and BD messages. Not a city login.

1 open P0 on the board · 3 acks due in field log. Stop-work / life-safety stay on top.

Sample board

Explore freely, then set up your jobsite when ready — Setup → New blank. Opening the app always lands on this board, not a blank project.

1Open P0
4Open reports

Priority stack · 4

P0safetyJobsite crew36h ago open

Temp power B-2 missing GFCI (wet side)

Building B · temp power · panel B-2

Panel B-2 wet-side circuits lack GFCI. Stop energize until kits installed and photo-documented. Life-safety hold — superintendent owns clear.

S. Patel (MEP lead)

P1safetyJobsite crew6h ago open

Stair tower 2 — incomplete fall protection

Stair tower 2

Landings missing mid-rail sections. Barricade up; crews staged off tower until corrected. Photo note recommended for insurance pack.

J. Okonkwo (safety)

P1inspectionJobsite crew18h agoseen

Footing re-inspect needed lines 5–6

Building B · grid 5–6

Inspector found chair height deficiency at two locations. Corrected chairs; re-request when bay open. Attach photos to this report from Board.

L. Nguyen (civil) · wired to authority lane · seen by M. Reyes

P2materialsOffice desk30h ago open

Curtain wall sealant lot certs pending

South elevation

Mock-up set south elevation. Continuous run blocked until lot certificates on file with office.

A. Chen (GC PM)

Photo notes

No photo notes yet. Use Photo note or attach images when filing a report.

Inspections

Footing / rebar — Building B

2026-08-03 · 07:30–10:00 · Grid lines 3–6

ready for inspector

Framing rough — level 2

2026-08-07 · Afternoon · Building B level 2

requested